Use flare gas to generate your own power and sell it to SaskPower with the Power Generation Partner Program.

Project Cap

  • Flare gas generation projects must be over 100 kW up to and including 5 MW.
  • You can submit applications for more than one project. But the total power generated from all projects (renewable and carbon neutral) must be 5 MW or less.

Generation Map

Our map highlights areas where we’ll select projects first. Please review this map before submitting an application.

Program Costs

Along with your system cost, you’re also responsible for these program costs:

Program Costs
Type
Cost

Application Fee (Non-refundable)

$315 (GST included)
Interconnection Study Fee (Non-refundable) $1050 (GST included)
Interconnection Costs $170,000/MW and $43,000/km
Operation and Maintenance Cost 1.25% of the project’s total interconnection costs (2% annual escalation)
Electrical Inspection Once accepted into the program, you’re responsible for your own electrical inspection.
Power Supply Rate Electricity consumed by the Project's generation facility will be charged under the applicable rate code.

*additional information on program costs are found in the Program Guidelines.

Energy Prices

We’ll purchase flare gas power at $70.00/MWh for applications made in 2018. For selected projects, this price will escalate at 2% annually.

Program and Technical Requirements

To apply for the program, you must meet all the requirements. This is why you need to meet with us or call us to review:

Application Window

We’re only accepting applications starting on Nov. 15, 2018 at 10 am, and all submissions must be received by SaskPower prior to Nov. 30, 2018 at 11:59 pm. You must meet with us prior to applying. Not all applications will be successful.

Ready to Get Started?

1

Please review the
Program Guidelines.

Download

2

Book a meeting
today!

CONTACT US

3

Apply for the
program now!

APPLY NOW

Express Yourself

This page makes me feel:
% INSPIRED
% INFORMED
% UNSURE
% ANNOYED
% FRUSTRATED