Opened: 1963
Where: Nipawin, SK
Fuel source: Hydro
Power capacity: 289 megawatts (MW)
Facts about the E.B. Campbell Hydroelectric Station
- Named in honour of E.B. (Bruce) Campbell, a former SaskPower president. He was the assistant chief engineer when we built the station.
- Located on the Saskatchewan River near Nipawin.
- There are 8 units in total that can produce 289 MW of power.
- The first 6 units were powered on in 1963 and 1964.
- The final 2 units were turned on in 1966.