COVID-19 Updates: Stay up to date with the latest updates on SaskPower’s response to the COVID-19 situation.
Our Report an Outage tool and SaskPower App will be unavailable from 11 pm to midnight on Saturday, Feb. 27 while we perform maintenance. It's one of the ways we're working to serve you better.
A minimum of 10 days between the date the foundation is poured and the in-service date is required for construction to occur.
Provide details with your site readiness/stage of construction below by checking the confirmed completed activities
Maximum allowed file uploads reached.
Maximum file size: 10 MB per file
Acceptable file types: GIF, JPG, JPEG, DOC, DOCX, BMP, PDF, PNG, PPT, PPTX, XLS, XLSX, VSD, DWG, DXR, DWF, TIF, TIFF
max 4 characters
max 5 characters
max 12 characters
Please complete as much as you know at the time of application.
max 3 characters
max 1 number
max 2 characters
max 9 characters
If applicable
If your request is located in an urban municipality (not within a rural municipality), SaskPower will share your information with SaskEnergy. SaskEnergy will also provide you with a tracking number for your natural gas application(s) within a few days.
SaskPower and SaskEnergy will share a joint trench in the municipalities of Saskatoon, Warman, Dalmeny, Martensville and Regina. Conduit for the communication providers (SaskTel, Shaw, or Access), will be installed in the trench for all urban municipalities
It is the homeowner's responsibility to apply for communication services to one of these providers
Note:
Get the most accurate service you need. Tell us about any special power needs you have (e.g. hours of operation, list of equipment etc.).
When you submit this form, we will provide you with a confirmation code. Questions about this application process? Call 1-888-757-6937